Modern construction sites often face insufficient power supply capacity or significant delays in the expansion of the grid infrastructure. The solution to this challenge is BESS mobile energy storage systems, which allow a project to get underway without having to wait for the permanent power supply.

Handling peak power demand

Equipment with high inrush currents, such as tower cranes, generates sudden peaks in power demand. NJORD systems act as a power buffer, absorbing dynamic loads and stabilising the operation of the entire power system. This allows your company to use a smaller connection whilst maintaining the full capacity of its machinery.

Operational benefits for contractors

The use of energy storage systems eliminates the need to oversize power supply systems and enables quiet operation in densely built-up urban areas. This translates into improved project economics and a higher standard of operation, whilst maintaining full resilience to infrastructure constraints.