Energy independence on the construction site despite grid constraints
We are able to commence construction projects without delays caused by a lack of or insufficient grid connection capacity. Our BESS systems act as efficient power buffers to handle peak loads.
Solutions tailored to modern construction
01
Operation of tower cranes
NJORD energy storage systems effectively handle the high starting currents of lifting machinery, preventing grid overloads and eliminating the need for costly oversizing of your company’s permanent power connections on the construction site.
02
Power supply for the container depot
We guarantee the reliable operation of site offices and staff containers by utilising smart hybrid systems that optimise daily energy consumption and reduce the operating time of generators during periods of low demand.
03
Integration with photovoltaic systems
We utilise the potential of the compact FLEX 15R units, which feature a built-in solar inverter, to connect the system directly to the panels installed on the roofs of the technical support facilities at your fieldwork site.
Ensure the continuity of your construction work
Please contact our experts to receive a detailed load analysis and select a system that is perfectly suited to the specific requirements of your upcoming project.

